Cart items: 0  Total: $0.00



Strong Enterprises

SB-26, Strong Quasar - MANDATORY -


Product #: SB-26_Quasar_FD
Add to Cart

[Add to Wishlist]

Status:   MANDATORY BEFORE NEXT JUMP 

Document...
                Type:   Free PDF Download
                 Title:   Service Bulletin #26
   Manufacturer:   Strong Enterprises
                Date:   April 18, 2007
          Revision:  
            Part No:  
        No. Pages:   
         Condition:  
         Comment:  

 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Applicable to...
   Manufacturer:   Strong Enterprises
            Model:   Q
uasar II, P/N115100, Quasar II Trainer P/N115102,
                       
Military Quasar II P/N 115103.
             Status:   MANDATORY BEFORE NEXT JUMP
        Serial No.:  
          Part No.:   115100, 115102, 115103
               DOM:  
             Other:    


 

Service Bulletin - Quasar II

Posted Thu Apr 19 2007By Tom Noonan

SERVICE BULLETIN #26 - ISSUE DATE: April 18, 2007

SUBJECT: Quasar II, P/N115100, Quasar II Trainer P/N115102, Military Quasar II P/N 115103.

Quasar II Reserve pilot chute launch under conditions with main canopy still in main container.

IDENTIFICATION: All Quasar II harness/container systems. Including both Quasar IIs with ?Flinger/PRO? (Positive Reserve Opening) assembly installed as original installation or modification, and those without.

STATUS: Mandatory removal of ?Flinger?/PRO assembly and replacement of inner sub-flap with pilot chute Base Plate and pilot chute before next jump.

BACKGROUND: Recent on-the-ground activations of several Quasar II reserve containers with the main canopy still in the container, showed slow or impeded pilot chute activation. There have been no reports of in-air incidents. Repeated tests with the main tray open and riser covers off (simulating an open main to reserve cutaway), resulted in clean reserve pilot chute deployments clearing the reserve container. Further testing revealed the steel ?Flinger?/PRO assembly may take a set beyond the designed acceptable range, restricting movement of the side flaps and reserve pilot chute.

SERVICE BULLETIN: As a precautionary measure, Strong Enterprises requests that all Quasar II systems be returned to Strong Enterprises for modification, that includes:

  1. Removal of the steel ?Flinger?/PRO assembly.
  2. Top sub-flap replacement (improved with a Base Plate.)
  3. Pilot chute replacement.

STRONG ENTERPRISES
11236 SATELLITE BLVD
ORLANDO, FL 32837
Tel 407 859 9317
Fax 407 850 6978
ted@strongparachutes.com
www.strongparachutes.com

Download the Bulletin in PDF

Download the Press Release






FaceBook Twitter YouTube Email Newsletter
Click here for BBB Business Review




WARNING - Sport parachute jumping (skydiving) is a potentially dangerous activity that can result in injury or death. Each individual participant, regardless of experience, has final responsibility for his or her own safety.